just would like to have some guidence on this please. i want to upgrade my boiler due to it being quite old.
British gas have been to have a look and have quoted for a condesing Worcester Greenstar 18Ri high effciency boiler at £3'327.75 ! this price includes the -£400.00 scrapage scheme. Included in price is that i will need upgrading copper gas piping to the boiler, brickwork replacement for old flue and reboring new flue position. all electrical work, bonding, new stats etc.
Please could someone give guidence on roughly what i should be paying as i know B.G are or can be ££££
British gas have been to have a look and have quoted for a condesing Worcester Greenstar 18Ri high effciency boiler at £3'327.75 ! this price includes the -£400.00 scrapage scheme. Included in price is that i will need upgrading copper gas piping to the boiler, brickwork replacement for old flue and reboring new flue position. all electrical work, bonding, new stats etc.
Please could someone give guidence on roughly what i should be paying as i know B.G are or can be ££££