I need to replace the abutment flashing on my roof. The abutment wall is rendered all the way down to the double lap roof tiles. From what I can work out I need to..
Remove about 100mm of rendering above the tiles.
Fix flashing soakers.
Fix step strips of flashing into the exposed motar joints.
fix a rendering stop above the line of the stepped flashing
Render up to the rendering stop.
Is this correct?