Hi all,
New here so apologies if this is a silly question. I've looked in lots of places and cant find the answer
I am having a garden wall repointed and I am considering raking out the joints myself to keep the labour costs down.
Is it ok to rake out all the joints on both sides prior to starting the repointing, (the wall needs repointing on both sides). Or would you normally do one side at a time?
Any advice welcomed.
Cheers
Chris