We are building an extension to existing property which is sited on a sloping plot. Excavating out and installing a retaining wall. Mains supply comes from boundary down to house on a slope......20m distance and 5 foot drop. We have unearthed the supply, is it likely to be difficult or very costly or even possible to have this rerouted along a new flat bed and stepped up to the boundary??