My plumber has fitted a slimline resin (not stone) shower tray on my suspended bathroom floor. The floor is to be tiled and I have noticed that the 18mm ply is butted up to the tray and not underneath it, do I need to discuss this with him as I understood the tray should be fitted on top of the ply?
Thanks
Thanks