Hi All,
Doing a DIY extension and looking for a some advice.
I have put the box steel in above the bifold opening which was quite a big one at 300 x 200 x 8 RHS. This means the top of the box steel is around 2.45m and given the height restriction and it being a warm roof I am tight on space.
Can I rest the ceiling joist straight on top of the steel? and if so how would you secure them in place, I was thinking to put joist straps in and use a steel nail gun straight into the steel.
any advice would be appreciated
TIA
Doing a DIY extension and looking for a some advice.
I have put the box steel in above the bifold opening which was quite a big one at 300 x 200 x 8 RHS. This means the top of the box steel is around 2.45m and given the height restriction and it being a warm roof I am tight on space.
Can I rest the ceiling joist straight on top of the steel? and if so how would you secure them in place, I was thinking to put joist straps in and use a steel nail gun straight into the steel.
any advice would be appreciated
TIA