View media item 9223 scaffold up, skip and chutes set up,front stripped felted and strapped ,ready for removal of 4 vent chimney.
back stripped and gable felted and battened out.
back felted ready for counter battens (Scottish br)
chimneys removed, twinwall gas flues installed, roof strapped out ready to be loaded.
loaded and set for tiling.
front tiled...oh and new upvc facings soffits and gutters.
kicking off the back with the junction to next doors roof.
and the back tiled.slate pieces to go round vent terminals.
gable complete.
and gutters up.
hip tiles on and front gutters up.
all done.
finished.
home time
back stripped and gable felted and battened out.
back felted ready for counter battens (Scottish br)
chimneys removed, twinwall gas flues installed, roof strapped out ready to be loaded.
loaded and set for tiling.
front tiled...oh and new upvc facings soffits and gutters.
kicking off the back with the junction to next doors roof.
and the back tiled.slate pieces to go round vent terminals.
gable complete.
and gutters up.
hip tiles on and front gutters up.
all done.
finished.
home time