A bit of a follow on from a previous Q regarding an extension...
... if i have an extension built I will need to have the rising main moved sooo would I need to dig up the pipe right make to where it joins the main feed (and where my water meter is) back in the road or is it possible to connect old pipework ( I have no idea how old but know it is buried under 45 foot of a concrete pathway ) to a new rising main in what would be the new bathroom.
The current pipework would basically need to be reduced by 2 metres and a new connection put on to make a rising main.
On a tangent - is it possible to reduce pressure from the mains before it enters the house?
Cheers,
Heidi
... if i have an extension built I will need to have the rising main moved sooo would I need to dig up the pipe right make to where it joins the main feed (and where my water meter is) back in the road or is it possible to connect old pipework ( I have no idea how old but know it is buried under 45 foot of a concrete pathway ) to a new rising main in what would be the new bathroom.
The current pipework would basically need to be reduced by 2 metres and a new connection put on to make a rising main.
On a tangent - is it possible to reduce pressure from the mains before it enters the house?