Hi guys, I am back with some more thoughts.
I was thinking i have a purlin which runs from gable to gable in my loft. i have a support which i want to take out, could i run say two more purlins above and below the existing one to take the load, i cant put an RSJ in as i have been told my wall thicknesses are not thick enough.
Secondly is there any calculations on how many treads my stair has to be if i have the length/run of the stairs and the height of the existing ceilings.
Thanks for any replies.
Ian
I was thinking i have a purlin which runs from gable to gable in my loft. i have a support which i want to take out, could i run say two more purlins above and below the existing one to take the load, i cant put an RSJ in as i have been told my wall thicknesses are not thick enough.
Secondly is there any calculations on how many treads my stair has to be if i have the length/run of the stairs and the height of the existing ceilings.
Thanks for any replies.
Ian