Hello guys,
I'm going to start getting some quotes for some gas work. I want to know a ball park figure of what you guys would think before I get anything done.
All work is within the kitchen, kitchen is an empty bring room with no render or ceiling. The floor is solid concrete. The walls all lime mortar.
1* Run a gas line from the meter to the hobs, about 6 foot.
2* Run a gas line from meter to the boiler, opposite corners of the kitchen, would be about 25 feet to run along down and across the kitchen.
3* Hang the boiler
4* Connect gas feed to boiler, hook up CH and other hot water to feeds to the boiler which will all be waiting for connection.
5* set the boiler up ready for use.
6* hook up hob feed.
Thanks in advance. I just want to have a rough idea in my head.
James
I'm going to start getting some quotes for some gas work. I want to know a ball park figure of what you guys would think before I get anything done.
All work is within the kitchen, kitchen is an empty bring room with no render or ceiling. The floor is solid concrete. The walls all lime mortar.
1* Run a gas line from the meter to the hobs, about 6 foot.
2* Run a gas line from meter to the boiler, opposite corners of the kitchen, would be about 25 feet to run along down and across the kitchen.
3* Hang the boiler
4* Connect gas feed to boiler, hook up CH and other hot water to feeds to the boiler which will all be waiting for connection.
5* set the boiler up ready for use.
6* hook up hob feed.
Thanks in advance. I just want to have a rough idea in my head.
James