hi had some calculations done for a job
ie a beam over a 6mt opening this was done 12mth ago
SE calculated i needed two 254/146/37 rsj welded together on the flanges
looking at the job wanted to know can i use box section ie 250/250/8
would ask SE but he pass a way
thanks rob