Hi - I am installing new kitchen and changing position of sink. Access to soil pipe is 3m from sink and will run behind units with one 90 degree bend. At end of run just before soil path the waste will pick up washing machine and dishwasher waste. Would 40mm pipe be sufficient with appropriate drop across length or would I need to go to 50mm.
Also I assume welded pipe would be much better than push fit.
Thanks
Nigel
Also I assume welded pipe would be much better than push fit.
Thanks
Nigel
Last edited: