Newbie on the scene......
Have a Siemens RWB9 control which does the time switching for both my HW and CH. I want to wire in the Salus 500 so it will demand on temp rather than just time. (Working on assumption that Salus cannot do CH and water?)
Wiring is as I found it on buying the house, with power that can be isolated via an adjacent fused switch.
3 x 3 core cable running to recess box as follows
N - 2xRed
L - 2 xBlack
1 - nil
2 - nil
3 - 1 x Red
4 - 1 x Black
earths are just wired to the recess box. Wiring will need to be separated to leave HW control with Siemens RWB9? Any assist with which wires to separate and reconnect to Salus please?
Would rather ask than experiment??
Boiler is a Potterton Prima1F - getting on a wee bit but serviced every year under contract and still efficient.
Thanks in advance....
Colin
Have a Siemens RWB9 control which does the time switching for both my HW and CH. I want to wire in the Salus 500 so it will demand on temp rather than just time. (Working on assumption that Salus cannot do CH and water?)
Wiring is as I found it on buying the house, with power that can be isolated via an adjacent fused switch.
3 x 3 core cable running to recess box as follows
N - 2xRed
L - 2 xBlack
1 - nil
2 - nil
3 - 1 x Red
4 - 1 x Black
earths are just wired to the recess box. Wiring will need to be separated to leave HW control with Siemens RWB9? Any assist with which wires to separate and reconnect to Salus please?
Would rather ask than experiment??
Boiler is a Potterton Prima1F - getting on a wee bit but serviced every year under contract and still efficient.
Thanks in advance....
Colin