Right, need to run a sub main.
Main board Wylex Split Load CU spares ways on both sides.
Run is about 15m
Customer would like a shower 10.5Kw plus ring final and lighting circuit x 2 (internal and external lights 2 lights on each) also to be 2 extractor fans, saniflow unit.
I have done my calculations and this is a shade short of 60A, so 10mm SWA supply required, the problem I have is I cannot find a supplier who stocks Wylex 60A MCB's.
Is it me and have i forgotten something??
Main board Wylex Split Load CU spares ways on both sides.
Run is about 15m
Customer would like a shower 10.5Kw plus ring final and lighting circuit x 2 (internal and external lights 2 lights on each) also to be 2 extractor fans, saniflow unit.
I have done my calculations and this is a shade short of 60A, so 10mm SWA supply required, the problem I have is I cannot find a supplier who stocks Wylex 60A MCB's.
Is it me and have i forgotten something??