screed or concrete

Joined
21 Dec 2003
Messages
49
Reaction score
1
Country
United Kingdom
Hi all
a friend of mine is getting a patio, self build.
He has a concrete base already across the garden, so he has laid 2 courses of brick on top of this which would bring him up to the damp course of the house. does he have to bring the floor of his patio to damp course level. or can he run the new floor one course high, this would mean his new floor would be one course lower than his damp course.
also what would be the best way to lay floor? he already has a concret base so what would be the next step.
nb: He would rather have his floor a one course high if this could be done, but i believe the damp course hase to be at least 2 course.
than you
 
Sponsored Links
should always be a gap of a least 2 brick courses between DPC and ground level.
 
the patio should be aminimum of 2 bricks below the existing house dpc otherwise you building yourself a problem
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top