I have a large floor to screed, getting on for 60m2. My problem is that it is a long way from the road to my new rear extension and my girlfriend (unpaid labourer!) has hurt her shoulder so I have to do the job by myself. I think I need some 4.5 tonnes of screed so it will be too much to have it delivered ready mixed and wheelbarrow it round and lay it in a day and I can’t find anywhere locally that can pump it round (even if I did have the money to pay for that) so my plan is to mix it up myself in batches and lay it over a few days doing maybe 15m2 a day. I am sure this isn’t ideal but I am wondering if it is a reasonable way to go? Am I going to cause any serious problems by doing it in this way?
The screed will be about 7.5cm thick on dpm and 100mm of jablite which sits on a reinforced concrete raft (150mm thick at minimum). Mix maybe 4:1, sharp sand : ordinary cement?
Any advice gratefully received.
The screed will be about 7.5cm thick on dpm and 100mm of jablite which sits on a reinforced concrete raft (150mm thick at minimum). Mix maybe 4:1, sharp sand : ordinary cement?
Any advice gratefully received.