Hi first poster here, have found the forums very helpful while doing my extension but not having much luck finding an answer to this problem.
I have laid the mass concrete on my kitchen floor (over hardcore, dpm, 100insulation, DPM (extra for radon)) now I have to do the tricky bit of laying the screed. If I only run it up to and not over the insulation between to the floor and walls then when placing floor tiles on top around the edges they will rest on 100mm of compressed insulation foam. Will this support a kitchen unit standing on these edges running round half the room? OR should I run the screed over the foam (thereby creating a cold bridge) to the walls? Any suggestions would be great.
Cheers
I have laid the mass concrete on my kitchen floor (over hardcore, dpm, 100insulation, DPM (extra for radon)) now I have to do the tricky bit of laying the screed. If I only run it up to and not over the insulation between to the floor and walls then when placing floor tiles on top around the edges they will rest on 100mm of compressed insulation foam. Will this support a kitchen unit standing on these edges running round half the room? OR should I run the screed over the foam (thereby creating a cold bridge) to the walls? Any suggestions would be great.
Cheers