Hi all,
I have a screeded floor in my newish extention (1 year old) and am at last ready to actually plan laying the flooring.
The screed is very dusty will I need to put some sort of pva across the whole thing before laying the floor? Obviously after thouroughly hoovering it.
Also the screed falls away towards the patio doors, should i just fill these areas with a leveling compound ?
I was thinking of trying to lay 15mm engineered using the sika liquid batton method, thinking this would be a better job than my other option which was going to be floating the whole lot on an underlay?
Any advice welcome
As usual thanks in advance.
Worz
I have a screeded floor in my newish extention (1 year old) and am at last ready to actually plan laying the flooring.
The screed is very dusty will I need to put some sort of pva across the whole thing before laying the floor? Obviously after thouroughly hoovering it.
Also the screed falls away towards the patio doors, should i just fill these areas with a leveling compound ?
I was thinking of trying to lay 15mm engineered using the sika liquid batton method, thinking this would be a better job than my other option which was going to be floating the whole lot on an underlay?
Any advice welcome
As usual thanks in advance.
Worz