Joined
24 Jul 2023
Messages
1
Reaction score
0
Country
United Kingdom
Hi,

Will be taking up my floorboards in an upstairs bathroom and fitting caberflooring of which needs to be screeded to be made level as it's about 11mm out. I've bought Mapei Ultraplan 3240 Self-Levelling Compound 25kg https://www.screwfix.com/p/mapei-ultraplan-3240-self-levelling-compound-25kg/4959f?ref=SFAppShare

Once I had fitted the caberflooring, I was going to primer the caberflooring and then screed and then tile on to the screed. Is there any more steps. What do I use for around the gaps / joins? Guessing a scrim or will it need to be tanked or plywood over the caberflooring and then screeded?

Floor will be tiled.

UK. Thank you.
 
Last edited:
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top