heres the situation. building is about 60M by 15M. old DB is at front. last 15M of building are going to be small offices. there will be 2 lighting and 2 power circuits. question is, would it be better to add a second DB at the back for the offices or use the DB at the front (voltage drop over a ong length etc etc)?