Hey all,
Another question here. I've lifted all the floor tiles and adhesive from the floor, but have left some deeper marks where the chisel worked extra hard! The floor has a deviation of about 12mm. Should I use Ardex rapid repair mortar to fill the deep areas, then Ardex NA to level, Ardex DPM and finish with 2mm of NA?
Second and maybe silly question, would you both doing this for the area where the units are going? The whole room is only 3x4, but the extra cost of the DPM will add up. Worth noting that the floor is a little damp, but to what extent I don't know. We did want to lay engineered wood to tie into the dining room, but have now decided against that as we don't want warped wood if the floor is damp.
Third question, does Ardex NA allow me to lay any floor covering over, is there a restriction on what adhesive I should use?
As always, thanks in advance.
Another question here. I've lifted all the floor tiles and adhesive from the floor, but have left some deeper marks where the chisel worked extra hard! The floor has a deviation of about 12mm. Should I use Ardex rapid repair mortar to fill the deep areas, then Ardex NA to level, Ardex DPM and finish with 2mm of NA?
Second and maybe silly question, would you both doing this for the area where the units are going? The whole room is only 3x4, but the extra cost of the DPM will add up. Worth noting that the floor is a little damp, but to what extent I don't know. We did want to lay engineered wood to tie into the dining room, but have now decided against that as we don't want warped wood if the floor is damp.
Third question, does Ardex NA allow me to lay any floor covering over, is there a restriction on what adhesive I should use?
As always, thanks in advance.