Is this stuff breathable, can the screed beneath it breath.
I have juts laid 75mm of screed on my UFH pipes and now have to let my floor dry out for four weeks before I can turn on the under floor heating.
The floors pretty level but has a few dips.
Any advice would be well appreciated.
My floor is around 10m2.
I have juts laid 75mm of screed on my UFH pipes and now have to let my floor dry out for four weeks before I can turn on the under floor heating.
The floors pretty level but has a few dips.
Any advice would be well appreciated.
My floor is around 10m2.