Self levelling on top of screed

Joined
19 May 2007
Messages
163
Reaction score
1
Country
United Kingdom
Our kitchen floor was screeded (75mm) 3 days ago. How long do I have to wait before it will dry out and I can put self levelling on top?
 
Sponsored Links
Just a slight dip in the middle and a bit sandy on top. Thought when tiling it would be better plus teh existing floor and new floor would match up better. Maybe I'm doing it wrong then. What should I have done.
 
Sponsored Links
I agree with Mikric,

I you have just had it screeded why are you putting down self levelling compound, it should already be level.
 
Kinell,
Best to get the levels sorted with something before putting the floor tiles down. A small step for man, but not when ****ed
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top