I have recently had a new extension fitted, however were the extension meets the existing dining room and original kitchen the floor is out by 3 inch's. We were thinking of now having a step down into this new room from the dining room and the kitchen. The floor at present is currently up to the concrete slab with all insulation underneath and damp course. Can i just use self levelling compound to level the floor and bring it up up by one inch or do i need a screed mix laid, i only want to bring it up an inch at most, then lay laminate flooring over??????