My name is george and I live in NSW, Australia.
My sewer is blocked between the inspection plate and the main sewerage pipes; there is only one metre between the two.
I have dug to about a metre from the main sewer pipe and opened an inspection hole.
Do I have to dig all the way to the main? Or does anybody know how my sewer connects with the main?
For example, does my sewer pipe go all the way to the main and then drop vertically? Or does it go diagonally or any other way down?
Thanking you in advance,
George.
My sewer is blocked between the inspection plate and the main sewerage pipes; there is only one metre between the two.
I have dug to about a metre from the main sewer pipe and opened an inspection hole.
Do I have to dig all the way to the main? Or does anybody know how my sewer connects with the main?
For example, does my sewer pipe go all the way to the main and then drop vertically? Or does it go diagonally or any other way down?
Thanking you in advance,
George.