Hey there.
I'm trying to make a base for a new shed which we have just bought.
I used to do labouring for building works, so I have a little knowledge about floors, bases etc. but I'm not amazing at the maths.
Could someone tell me how much ballast and bags of cement I would need for the base.
I don't need the scalpings as where the base is going, you can only dig down 4-5 inches and there is already hardcore there.
I will just level it off an go over it with a wakka plate.
I will make the frame for the shed 12.1 ft by 8.1ft just to make sure it fits perfect.
Thanks in advanced
I'm trying to make a base for a new shed which we have just bought.
I used to do labouring for building works, so I have a little knowledge about floors, bases etc. but I'm not amazing at the maths.
Could someone tell me how much ballast and bags of cement I would need for the base.
I don't need the scalpings as where the base is going, you can only dig down 4-5 inches and there is already hardcore there.
I will just level it off an go over it with a wakka plate.
I will make the frame for the shed 12.1 ft by 8.1ft just to make sure it fits perfect.
Thanks in advanced