Evening everybody,
I am having a new shed built (16' x 8').
The slabs that I was going to lay it on are not level enough for the shed. I have been advised that I should take them up and relay them all on a sand base.
I was wondering if it may be quicker to do a concrete base (100mm) on top on the slabs, as time is of the essence.
I have calculated I will need just over 1.4 cubic metres of concrete.
Two questions: Is it a reasonable idea and any idea how much it would cost?
Cheers
Aldo's Dad