Morning all
I have created a 10x8 raised shed base with board 100mm wide. I have dug down and filled the ground with smashed house bricks and slabs, then used some bags of crush run over the top and wacked it down as best I can, its been settled a few weeks now and seems pretty solid.
So I still need to hire a wacker plate? or will it be okay to concrete poured on top now for a shed?
Thanks
I have created a 10x8 raised shed base with board 100mm wide. I have dug down and filled the ground with smashed house bricks and slabs, then used some bags of crush run over the top and wacked it down as best I can, its been settled a few weeks now and seems pretty solid.
So I still need to hire a wacker plate? or will it be okay to concrete poured on top now for a shed?
Thanks