Hi,
Dug out a hedge with a digger, and now going to drill 2ft holes where the hedge was for 4" posts / 6ft fence.
Should i wack the ground before drilling the post holes? Its quite soft soil and its 18" until i hit clay.
Using a petrol hole borer to drill the holes.
Dug out a hedge with a digger, and now going to drill 2ft holes where the hedge was for 4" posts / 6ft fence.
Should i wack the ground before drilling the post holes? Its quite soft soil and its 18" until i hit clay.
Using a petrol hole borer to drill the holes.