We recently had a new Remeha boiler fitted by a Gassafe engineer.
I have noticed that the gap betwwen the flue and the hole in the brickwork, both inside and outside, is only covered by a large rubber flange/groomet that fits tight around the flue.
Should this small gap be cemented outside, as well as cemented/plastered inside? Is the grey rubber grommet sufficient on its own?