Hi My friend is putting in a whole new bathroom and has insisted I help him as I used to do building services and was pretty handy. He got some moisture resistant plasterboard, the green stuff, and used that on one stud wall and then he had this really rough brick wall one end with bricks protruding for which he asked me to help him dot & dab the boards on to.
We chipped off the worst protrusions off and then brushed the wall down to get rid of any dust or loose material first. I told him to check if dot & dab was ok for bathrooms but someone had advised him that it was ok so we went with that idea.
He is having a bath with a wall shower, with pipes and mixer in the stud wall. What I would like to know is whether to tank the area around the bath, shower or both, bearing in mind he has used green board.
I did a bathroom a while back and with that it was just a shower and no bath and I tanked the shower area with what I think was called a Bal W1 kit, but should this be done also around the bath especially around the shower area?
If it were my own I think I would anyway just as belt and braces even if I had used green board but what is the correct way to do this job where tanking is concerned, around the shower area only or around the whole lot?
I should add the whole area around the bath is to be tiled.
Any advice or help appreciated.
We chipped off the worst protrusions off and then brushed the wall down to get rid of any dust or loose material first. I told him to check if dot & dab was ok for bathrooms but someone had advised him that it was ok so we went with that idea.
He is having a bath with a wall shower, with pipes and mixer in the stud wall. What I would like to know is whether to tank the area around the bath, shower or both, bearing in mind he has used green board.
I did a bathroom a while back and with that it was just a shower and no bath and I tanked the shower area with what I think was called a Bal W1 kit, but should this be done also around the bath especially around the shower area?
If it were my own I think I would anyway just as belt and braces even if I had used green board but what is the correct way to do this job where tanking is concerned, around the shower area only or around the whole lot?
I should add the whole area around the bath is to be tiled.
Any advice or help appreciated.