Considering the instalation of a 9.8kw Mira shower.
Measured the mains pressure & flow rate looks OK.
When installing pipe run, which will be around 7m, should I Tee a dedicated line after my stoptap, before any other draw-offs, straight off the main? or would it not make that much difference coming off mains pipework already feeding 2 wc's?
Cheers Dave.
Measured the mains pressure & flow rate looks OK.
When installing pipe run, which will be around 7m, should I Tee a dedicated line after my stoptap, before any other draw-offs, straight off the main? or would it not make that much difference coming off mains pipework already feeding 2 wc's?
Cheers Dave.