- Joined
- 2 Feb 2021
- Messages
- 23
- Reaction score
- 1
- Country
Shower Installation
Isolate water to existing cold water storage tank in loft and hot water cylinder in airing cupboard. Drain down cold water storage tank in loft and install a 22mm tank connector and lever valve isolator. Drain down existing hot water cylinder in airing cupboard and install a 22mm Essex Flange, complete with anti vac loop and lever valve isolator. Cap off 15mm mains water supply in loft to existing electric shower. Install new 22mm twin impeller pump on floor in airing cupboard. Run a new 22mm supply pipe from tank connector to Essex Flange to pump and then new 22mm supplies out of pump into loft area above bath. Remove tiles above bath and chase out wall to install 2 x 15mm hot and cold supplies to new bar shower valve. Wire up new pump complete with 13amp plug top and single socket. Turn on water and refill existing cod water storage tank and hot water cylinder. Commission and test new pump and shower.
LABOUR ONLY ??.
Question ?
How much should I be paying for this min - max?
Any guidance is much appreciated. I'm based in the South East , but not London.
Last edited: