I purchased a pearl stone shower tray and paid extra to get the additional riser kit leg set.
The tray is 760 x 760 and I have used the 6 legs supplied and levelled but still not convinced that it's solid. There is a bit of movement as the legs are cheap plastic into a metal thread.
I have yet to seal it to the wall so this will help but as the gap is exactly 100mm high should I add some timber 4x2 to help support it? I have my waste and water pipes running underneath but could cut the timber and place in the gaps.
The floor is level and secure.
Thanks
The tray is 760 x 760 and I have used the 6 legs supplied and levelled but still not convinced that it's solid. There is a bit of movement as the legs are cheap plastic into a metal thread.
I have yet to seal it to the wall so this will help but as the gap is exactly 100mm high should I add some timber 4x2 to help support it? I have my waste and water pipes running underneath but could cut the timber and place in the gaps.
The floor is level and secure.
Thanks