I am currently building a small side extension to my house under permitted development.
I managed to lay the foundations and build up to DPC last year before the winter kicked in. I am back on the case now and have a few questions if anyone can help.
The house is made out of imperial bricks and therefore I have used 70mm bricks and matched to the top line of the the houses existing courses (shown in photo).
I am hoping to lay the DPC and then lay two more courses of 70 mm bricks. I am then going to block work the rest of the extension with the intent of rendering the extension and the front of my property. My question is I am using this wall starter to tie in the block work to the house. As the blocks are metric the course levels will be out of line with the existing imperial house brickwork. On an aesthetic level i don't care what it looks like as i have the 6 courses of house bricks matched and inline (which will be shown and below the render) and I will be then be rendering the blocks.
My question may seem silly but is this method correct, using the wall starter and not matching courses? Is there any alternative. Many thanks.
I managed to lay the foundations and build up to DPC last year before the winter kicked in. I am back on the case now and have a few questions if anyone can help.
The house is made out of imperial bricks and therefore I have used 70mm bricks and matched to the top line of the the houses existing courses (shown in photo).

I am hoping to lay the DPC and then lay two more courses of 70 mm bricks. I am then going to block work the rest of the extension with the intent of rendering the extension and the front of my property. My question is I am using this wall starter to tie in the block work to the house. As the blocks are metric the course levels will be out of line with the existing imperial house brickwork. On an aesthetic level i don't care what it looks like as i have the 6 courses of house bricks matched and inline (which will be shown and below the render) and I will be then be rendering the blocks.
My question may seem silly but is this method correct, using the wall starter and not matching courses? Is there any alternative. Many thanks.