- Joined
- 29 Nov 2005
- Messages
- 34
- Reaction score
- 0
- Country
I have asked this on another forum..sorry but I need a quick answer.
So I am putting in my own CH system and my CORGI installer will do the bits he has to do and commission. Its Sunday and I cant get hold of him.
I have the boiler template on the wall. Boiler came yesterday. Its going between a window and a door in the kitchen.. I now realise that I haven’t quite got the 300mm from the edge of the flue horizontally to either the window or door frame, only about 285mm. Although almost 300mm to the actual bit that opens
If I understand the regs correctly, I see the only way out is to fit the boiler higher up the wall so that the bottom of the flue is horizontally above both the top of the window and the top of the door. Then the 300mm doesn’t count? Do I understand correctly. Or do I have to have 300mm from any part of the flue to an opening. The higher up the wall that I put the boiler the more problem I have with running the flow and return pipes. Its just the way joists etc run.
Could somebody please give me a yes or no as I want to run the flow and return pipes ASAP.
Thanks
So I am putting in my own CH system and my CORGI installer will do the bits he has to do and commission. Its Sunday and I cant get hold of him.
I have the boiler template on the wall. Boiler came yesterday. Its going between a window and a door in the kitchen.. I now realise that I haven’t quite got the 300mm from the edge of the flue horizontally to either the window or door frame, only about 285mm. Although almost 300mm to the actual bit that opens
If I understand the regs correctly, I see the only way out is to fit the boiler higher up the wall so that the bottom of the flue is horizontally above both the top of the window and the top of the door. Then the 300mm doesn’t count? Do I understand correctly. Or do I have to have 300mm from any part of the flue to an opening. The higher up the wall that I put the boiler the more problem I have with running the flow and return pipes. Its just the way joists etc run.
Could somebody please give me a yes or no as I want to run the flow and return pipes ASAP.
Thanks