Hi,
Can anyone tell me:
A) What diameter MDPE would be required for LPG supply from the 4 bottle changeover valve to boiler. Only appliance that will be connected is a Vaillant Ecotec Plus 831 combi.
Distance is approx 20M underground then will join existing 28mm copper for about 10M to boiler with minimal turns.
B) What depth the underground bit has to be? (pedestrian access only).
And C) No I'm not going to do it myself but am fed up with the 6 week delay in getting quotes out of my local Corgi and want to get the bits myself and get trench dug.
Cheers
Can anyone tell me:
A) What diameter MDPE would be required for LPG supply from the 4 bottle changeover valve to boiler. Only appliance that will be connected is a Vaillant Ecotec Plus 831 combi.
Distance is approx 20M underground then will join existing 28mm copper for about 10M to boiler with minimal turns.
B) What depth the underground bit has to be? (pedestrian access only).
And C) No I'm not going to do it myself but am fed up with the 6 week delay in getting quotes out of my local Corgi and want to get the bits myself and get trench dug.
Cheers