Hi,
I am looking to have my 15 m2 ceiling skimmed and then coved. Is this possible to do in one day or does the skim need to dry first?
Thanks
I am looking to have my 15 m2 ceiling skimmed and then coved. Is this possible to do in one day or does the skim need to dry first?
Thanks