Hi,
I have some chases to fill, a few are quite wide. The cases are partially filled with mortar/pva to between 2-5mm. The surface of the mortar is scrached. Before the first skim should the mortar be brushed with pva, if so what pva/water ratio, should the pva be wet, or left to go tacky or dry?
When skimming must I build up the skim in layers? If so, what is the max thickness of layer and how long should the plaster be allowed to go off before applying the next layer?
There is one socket surround that needs doing too, but that is much deeper - approx 10mm. Can I deep-fill with muti-finish in layers, or must it be built up eg with mortar first (I'm not going to buy a bag of a base coat just for that though).
Thanks,
Lu
I have some chases to fill, a few are quite wide. The cases are partially filled with mortar/pva to between 2-5mm. The surface of the mortar is scrached. Before the first skim should the mortar be brushed with pva, if so what pva/water ratio, should the pva be wet, or left to go tacky or dry?
When skimming must I build up the skim in layers? If so, what is the max thickness of layer and how long should the plaster be allowed to go off before applying the next layer?
There is one socket surround that needs doing too, but that is much deeper - approx 10mm. Can I deep-fill with muti-finish in layers, or must it be built up eg with mortar first (I'm not going to buy a bag of a base coat just for that though).
Thanks,
Lu