I have a patio that sits 4cm above an existing concrete path 90cm wide.
This is a trip hazard and want to blend in the patio to the path by constructing a concrete ramp.
How long should this be to safely blend in the height difference?
Also how do I prevent the ramp falling apart? What mix should I go for? Do I add fibreglass into the mix? Should I cut grooves into the path with an angle grinder to key the ramp?
Please help .