We have 2 courses of engineering bricks making up the above-ground DPC for a new extension.
A set of bifolds will be installed and I could do to drop these down the external brickwork a bit. Removing a whole course of DPC would be too big a drop, and it seems that shaving approx 30mm off the top of engineering bricks is not a simple task to get right.
Is there anything that would go in place of the 2nd course of DPC brickwork that could give a more controllable height, while doing the same job?