In need of urgent advice please: I need to renew the 90 degree soaker/s between a vertical gable end hung with western red cedar shingles and a lower adjoining conservatory roof made of polycarbonate. The run is about 5/6m in length. Originally code 3 lead was used, but I'd like to replace it with lead alternative Lead R flashing (aluminium sandwich construction with self adhesive.) Would be grateful to know if this will be suitable and if so, should I fit it in one continuous run or cut it into sections. If sections, how long and how much should I overlap between them. Can I nail or screw the upstand of the flashing to the timber batten on the vertical gable wall prior to renewing the bottom course of shingles ? Thank you