soffit/box end with no barge board

Ta. So, my order is:

1 fit fascia and soffit
2 finish cut gable bricks to the correct line level With top of rafter
3 fit undercloak, with a kick horizontal where it hits the fascia and soffit so it ends up on top of the fascia

Make sense or still wrong?
 
Sponsored Links
Sponsored Links
Which bit exactly is it that you don't like? I would be interested to know as this is a photo of my house.
Lol. That could have been awkward.

There is a rule with brickwork that there should be no cuts of less that half a brick within a wall, and any closure (1/4 brick) should only be placed towards the ends of a wall with a header on the end. So that should be a 3/4 cut and the bond reversed on the corbel.

It's not a structural issue just a visual one. It's not too bad otherwise.
 
Thanks, was just curious. I didn't do the brickwork myself but got some brickies in to do that as it would have taken me months I expect.
Having checked, they've done all the corbels the same way. So at least it is symmetrical ;)
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top