Hello
I made another post about removing and then installing the asbestos soil pipe on our house. Having spoken to a few firms I can see that it is likely there would have to be a removal of the current pipe by one company and installation by another. Would someone be able to give a rough estimate of the cost of installing new pipes if the existing asbestos one has already been fully removed?
Thanks for your time.
I made another post about removing and then installing the asbestos soil pipe on our house. Having spoken to a few firms I can see that it is likely there would have to be a removal of the current pipe by one company and installation by another. Would someone be able to give a rough estimate of the cost of installing new pipes if the existing asbestos one has already been fully removed?
Thanks for your time.