Hi guys,
Starting some work on my downstairs loo. The floor is, from what I can make out, concrete... very dark concrete and is roughly 1 inch thick. Directly underneath is soil . I'm thinking of breaking the old floor up and relaying it. The key question is, do I lay it directly over the bare soil? Should I add a layer of ballast before laying the new concrete?
My plan:
Break up old concrete.
Lay ballast over soil (only if absolutely necessary).
Lay sand and cement as advised in book (without agregate).
Paint on a 'damp proofing sealer'.
Lay screed with a depth of 1/4 inch and bring to level of skirting.
I would have thought that agregate would have been essential to the mix though .
Thoughts regarding my plan are very much appreciated.
Thank you.
Starting some work on my downstairs loo. The floor is, from what I can make out, concrete... very dark concrete and is roughly 1 inch thick. Directly underneath is soil . I'm thinking of breaking the old floor up and relaying it. The key question is, do I lay it directly over the bare soil? Should I add a layer of ballast before laying the new concrete?
My plan:
Break up old concrete.
Lay ballast over soil (only if absolutely necessary).
Lay sand and cement as advised in book (without agregate).
Paint on a 'damp proofing sealer'.
Lay screed with a depth of 1/4 inch and bring to level of skirting.
I would have thought that agregate would have been essential to the mix though .
Thoughts regarding my plan are very much appreciated.
Thank you.