Hi Guys,
I plan to install a new bathroom suite but need to move the toilet from its existing position to fit everything in. The toilet is currently on a side facing outside wall and is connected straight to the soil stack outside. I plan to move the toilet to a front facing outside wall so need to re-route the soil waste around one corner to connect to the soil stack. The total distanc from the new position to the soil stack is about 1.8 metres and i would be grateful of any ideas on how to go about this.
Thanks
I plan to install a new bathroom suite but need to move the toilet from its existing position to fit everything in. The toilet is currently on a side facing outside wall and is connected straight to the soil stack outside. I plan to move the toilet to a front facing outside wall so need to re-route the soil waste around one corner to connect to the soil stack. The total distanc from the new position to the soil stack is about 1.8 metres and i would be grateful of any ideas on how to go about this.