Ok,
Now starting on the staircase painting.
I've got a squeaky newell up at the top of the bannisters.
On below i've got a vid of the direction its loose.
Downstairs it comes out and ive got a solid knock next to the newell https://drive.google.com/open?id=0Bx6--fM-4q6VUFFPQjhKaVZrNTQ , i think this might be a lintel, so wondering if i can secure it into this as high as possible OR if i've got to take out plasterboard here to get higher and secure.
OR I can just do a bodge job and add a wedge between the chipboard floor board and newell, as when I bridge this gap it stops moving. here https://drive.google.com/file/d/0Bx6--fM-4q6VWEE5OVR4dmVjS0E/view?usp=sharing
Vid
https://drive.google.com/open?id=0Bx6--fM-4q6VWUU3amNmRzNzTE0
Now starting on the staircase painting.
I've got a squeaky newell up at the top of the bannisters.
On below i've got a vid of the direction its loose.
Downstairs it comes out and ive got a solid knock next to the newell https://drive.google.com/open?id=0Bx6--fM-4q6VUFFPQjhKaVZrNTQ , i think this might be a lintel, so wondering if i can secure it into this as high as possible OR if i've got to take out plasterboard here to get higher and secure.
OR I can just do a bodge job and add a wedge between the chipboard floor board and newell, as when I bridge this gap it stops moving. here https://drive.google.com/file/d/0Bx6--fM-4q6VWEE5OVR4dmVjS0E/view?usp=sharing
Vid
https://drive.google.com/open?id=0Bx6--fM-4q6VWUU3amNmRzNzTE0