- Joined
- 23 May 2017
- Messages
- 35
- Reaction score
- 0
- Country
I need to lay a concrete floor over an existing concrete floor to create a fall . 4 inches at the back wall falling to 2 inches at the front. Sand and 10mm aggregate as i want a smooth finish. Is 6 to 1 mix ok and will i add waterproofer to the mix? Also is a semi dry mix going to give me a better finish? Thanks Phil.