How much would I be looking at to install a new oak handrail/base rail and metal spindles? It’s a small staircase in a semi. 1.5m for the landing and 2.4m up the stairs.
I’ve priced the parts but how long would this job take? I’m thinking 2 days £500-£600? In the southeast?
Also is removing the newel post a tough job as one guy said it was a pain and I was better off with a cladding kit?
Thanks for advice.
I’ve priced the parts but how long would this job take? I’m thinking 2 days £500-£600? In the southeast?
Also is removing the newel post a tough job as one guy said it was a pain and I was better off with a cladding kit?
Thanks for advice.