Steel column backfil

Joined
14 Nov 2011
Messages
73
Reaction score
2
Location
Essex
Country
United Kingdom
Weve had two columns fitted for our goal post and they are bolted down to the foundations and are near on 900mm down from the finished floor level. We still have to insulate our floor slab and then screed etc. question is what can i backfill for around 600mm+ around the column base? Concrete up to oversite level?
 
Sponsored Links
Concrete normally to prevent the steel corroding. But your engineer should have specified what is required
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top